In early 2024 we completed the renovation of the old classroom block at Makhaza.
The classroom block had been ravaged by whiteants and the roof was collapsing.
We removed the old roof, raised and installed a new wider steel roof, added a verandah, fixed the floors, repaired all the windows, replaced all the doors, and painted the whole building.
Comments